NG9

M1 Junction 25 to 28 widening update to Sunday, April 5.

31 March, 2009

road-works-m1-update-april5 AMENDED - Junction 25 to Junction 26

The north and southbound carriageways will be reduced to three narrow lanes with no hard shoulder and a 50mph speed limit from Junction 25 to 26.
* The southbound carriageway will be reduced to a single lane between 10pm and 5am on Tuesday 31 March and Wednesday 1 April for surfacing work.

AMENDED - Junction 26 to Junction 27

The north and southbound carriageways have a 50mph speed limit in place.
* The southbound carriageway will be reduced to a single lane between 10pm and 5am on Thursday 2 April for surfacing.
* Lane one of the northbound carriageway will be closed between 9pm and 5am on Monday 30 March for surfacing work.
* The northbound carriageway will be reduced to a single lane between midnight and 5am on Friday 3 April for surfacing work.
* On Saturday 28 March there will be a Junction 27 southbound entry slip road closure between 9pm and midnight for safety reasons during excavation work.

AMENDED - Junction 27 to Junction 28

The north and southbound carriageways continue to be reduced to three narrow lanes with no hard shoulder and a 50mph speed limit. The southbound free flow lane from the A38 Mansfield remains closed until 2010.
* Both carriageways will be reduced to a single lane between 10pm and 5am from Monday 30 March to Thursday 2 April and midnight to 5am on Friday 3 April for bridge inspections.

By News Correspondent.

Share on Facebook

advertisers

ads ads ads ads ads